Cut your largest controllable cost for 25 years
Tamil Nadu business tariffs run from about ₹7.50 to over ₹10 a unit. A rooftop plant in Chennai generates around 1,400–1,550 units per kW a year, typically paying back in about 3–4 years, with 40% accelerated depreciation for eligible businesses that own the plant.
| Tariff category | Energy charge (₹/unit) | 100 kW plant: approx. savings per year | Approx. payback |
|---|---|---|---|
| HT I – Industries | 7.50 | ≈ ₹10.9 lakh | ≈ 3.7 years |
| LT III-B – LT industries | 8.25 | ≈ ₹12.0 lakh | ≈ 3.3 years |
| HT III – Commercial | 9.40 | ≈ ₹13.6 lakh | ≈ 2.9 years |
| LT V – Commercial | 10.45 | ≈ ₹15.2 lakh | ≈ 2.6 years |
Illustrative: energy charges from the TNERC tariff order effective 1 July 2025; 100 kW producing ~1.45 lakh units a year, all used on site; ₹40 lakh plant cost. Your proposal uses your actual bills and load profile. Full breakdown: commercial & industrial solar in Chennai: cost, ROI and process.
Solar for every kind of business
Factories & MSMEs
Day-shift loads and large sheet roofs: auto components, engineering, textiles, food processing.
Warehouses & cold storage
Large roofs and steady loads, ideal for maximum plant capacity.
Hospitals & clinics
Round-the-clock air-conditioning and equipment loads.
Schools & colleges
Daytime use and large terraces across campus buildings.
Offices, IT units & showrooms
Daytime cooling loads on high commercial tariffs. See solar for offices.
Hotels & malls
High, steady consumption with strong year-round savings.
What our solar EPC service covers
| Stage | What we do |
|---|---|
| Energy audit | Analyse 12 months of bills, tariff category, contract demand and load profile to size the plant for maximum on-site use |
| Engineering & design | Site survey, shading analysis, structural check, panel layout, string and inverter design, and a site-specific generation estimate |
| Proposal & financial model | Itemised bill of materials, project cost, savings, payback, depreciation benefit and financing options (CAPEX, loan or RESCO evaluation) |
| Approvals | TNPDCL (TANGEDCO) application and feasibility, Electrical Inspectorate approval where required, metering |
| Procurement | ALMM-listed Tier-1 panels, high-efficiency inverters, hot-dip galvanised structures, cables and protection |
| Installation | Safe working-at-height practices, installation planned around your operations |
| Testing & commissioning | Electrical testing, inspection, meter installation and grid synchronisation |
| O&M and monitoring | Remote monitoring, scheduled cleaning, preventive maintenance and performance reports |
Engineering standards we follow
- Cyclone-rated structures designed for Chennai's basic wind speed of 50 m/s under IS 875 (Part 3). See solar in Chennai's monsoon and cyclones.
- Hot-dip galvanised steel and corrosion protection for coastal and industrial environments.
- Metal-sheet roof solutions: rail or clamp mounting on the sheet profile, purlin strength checks, walkways and lifelines.
- RCC roofs: tilted or elevated structures that protect waterproofing and keep access for maintenance.
- Carports and ground mounts where roof space is limited.
- Electrical safety: earthing, lightning protection, surge protection and IP-rated enclosures.
Indicative plant cost and output
| Plant size | Indicative cost | Roof area (approx.) | Units per year (approx.) |
|---|---|---|---|
| 50 kW | ₹15–25 lakh | 4,000–5,000 sq ft | 70,000–77,500 |
| 100 kW | ₹30–50 lakh | 8,000–10,000 sq ft | 1.4–1.55 lakh |
| 250 kW | ₹75 lakh–1.25 crore | 20,000–25,000 sq ft | 3.5–3.9 lakh |
| 500 kW | ₹1.5–2.5 crore | 40,000–50,000 sq ft | 7–7.75 lakh |
| 1 MW | ₹3–5 crore | 80,000–1,00,000 sq ft | 14–15.5 lakh |
Indicative 2026 figures; per-kW cost falls with size. Your proposal is based on your site, roof type and equipment choice.
Industrial solar across Chennai and Tamil Nadu
We work with businesses across Chennai's industrial belts, including Ambattur, Thirumudivakkam, Guindy, Sriperumbudur, Oragadam, Irungattukottai, Maraimalai Nagar, Chengalpattu, Padappai and Gummidipoondi, as well as commercial buildings across the city.
Get a site-specific solar proposal
Share a few details and our engineering team will review your bills and roof, then send a plant design, generation estimate and ROI model. The form opens WhatsApp with your details filled in, so you can send it in one tap.
- Plant sizing from your actual load
- Savings, payback and depreciation benefit
- CAPEX, loan and RESCO comparison
Prefer to call? +91 77089 24365 · +91 90475 55786
Frequently asked questions
What does a solar EPC company do?
A solar EPC (Engineering, Procurement and Construction) company designs the plant, supplies the equipment, installs and commissions it, handles approvals, and usually provides operations and maintenance afterwards, so you deal with a single accountable partner.
How much does a commercial solar plant cost in Chennai?
Roughly ₹30,000–50,000 per kW in 2026, so about ₹30–50 lakh for a 100 kW plant. Larger plants cost less per kW. The final figure depends on roof type, structure, equipment and electrical work.
What is the payback period for industrial solar in Tamil Nadu?
Typically about 2.5–4 years under the 2025-26 business tariffs when most solar power is used on site. Accelerated depreciation can shorten it further for businesses that own the plant.
Can solar be installed on a metal-sheet factory roof?
Yes. Panels are mounted on rails or clamps fixed to the sheet profile. We check purlin strength and remaining sheet life first, and add walkways and lifelines for safe maintenance.
Do you handle TNPDCL approvals?
Yes. We prepare and file the TNPDCL (TANGEDCO) application, coordinate feasibility and inspection, arrange Electrical Inspectorate approval where required, and complete metering and commissioning.
Can we go solar without upfront investment?
Options include bank or term loans that keep ownership with you, and RESCO or PPA models where a developer owns the plant and you buy power per unit. We help you compare them against an outright purchase.
How long does a commercial solar project take?
A 100 kW project typically takes several weeks of execution after approvals, depending on site conditions and approval timelines.